Scheda tecnica
Fornitura chiavi in mano di n° 2 Turbogeneratori revisionati a zero ore composti da Turbine a gas con generatori da KW 3150 Data primo avviamento: 05.06.2004 SCOPO DEL LAVORO: 1 General 1.1 General description 2. Scope of supply 2.1 Gas turbines 2.2 Support frame 2.3 Starting system 2.4 Instrumentation 2.5 Lubrication 2.6 Gas fuel system 2.7 Liquid fuel system 2.8 Acoustic enclosure 2.9 Combustion air inlet system 2.10 Exhaust system 2.11 Main load gear 2.12 Generator 2.13 Control system 2.14 Miscellaneous 2.15 Training 3 Exclusion 3.1 Packing and transport 3.2 Maintenance 3.3 Spare parts 4 Reconditioning/Overhaul.scope of work 4.1 Acoustic enclosure 4.2 Generators 4.3 Oil/Air coolers 4.4 Cooler support structure 4.5 Cooler pipework 4.6 Inlet filter house and duct work 4.7 Exhaust 4.8 Lighting 4.9 Fire detection system 4.10 Fire fighting system 4.11 Diesel fuel pump system 4.12 Istrumentation 4.13 Main load gearbox and aux.gearbox 4.14 Turbine base plate 4.15 Turbine modules 4.16 Instr.and electr. control cubicles 4.17 Instrum.and power cables 5 Commissioning 5.1 Procedures 5.2 Documentation 6 Performance testing 6.1 Introduction 6.2 Phase1: liquid fuel 6.3 Phase 2: gas fuel 7 Engineering 7.1 Introduction 7.2 Design information 8 Schedule 8.1 Project 8.2 This purchase order 9 Document, data subm. requirem.
vai a SERVICE
Status at reception
Status at shipment
indietro
avanti